中文字幕综合一区,伊人av网,欧美中日韩在线,亚洲国产香蕉视频,黄视频在线免费,天天操天天爱天天爽,狠狠躁天天躁

軟題庫(kù) 學(xué)習(xí)課程
當(dāng)前位置:信管網(wǎng) >> 在線考試中心 >> 試題查看
試題題型【單選題】
試題內(nèi)容

Many of the activities performed during the preliminary investigation are still beingconducted in  (1) , but in much greater depth than before. During this phase, the analystmust become fully aware of the  (2)  and must develop enough knowledge about the(3)  and the existing systems to enable an effective solution to be proposed andimplemented. Besides the  (4)  for process and data of current system, the deliverablefrom this phase also includes the  (5)  for the proposed system.
(1)A、analysis phase
B、design phase
C、implementation phase
D、maintenance phase
(2)A、main symptom
B、root problem
C、final blueprint
D、data specification
(3)A、hardware environment
B、testing environment
C、software environment
D、business environment
(4)A、logical models
B、physical models
C、design models
D、implementation models
(5)A、hardware and software specification
B、system performance specification
C、formal requirements definition
D、general problem statement

查看答案

相關(guān)試題