試卷年份2019年上半年
試題題型【單選題】
試題內(nèi)容

()is an open , distributed ledger that can record transactions between two parties efficiently and in a verifiable and permanent way.
A、Internet of things
B、Blockchain
C、Edge computing
D、Artificial intelligence

查看答案

相關(guān)試題

66題: 有8口海上油井,相互間距離如下表所示(單位:海里)。其中1號(hào)井離海岸最短長(zhǎng)度,為5海里,先要從海岸經(jīng)1號(hào)井鋪設(shè)油管將各井連接起來,則鋪設(shè)輸油管道的最短長(zhǎng)度()海里。

A、9.1
B、9.2
C、10.1
D、10.2
答案解析與討論:www.jazzmuze.com/st/4099626302.html

67題: 項(xiàng)目經(jīng)理制定了項(xiàng)目資產(chǎn)負(fù)債表(單位:元),如下表所示。該項(xiàng)目的靜態(tài)投資回收期為()年,動(dòng)態(tài)投資回收期為()年(保留一位小數(shù)位)。

(69)A、2
B、2.4
C、2.8
D、3.
(70)A、3
B、3.4
C、3.5
D、3.6
答案解析與討論:www.jazzmuze.com/st/409978566.html

68題: The ()creates opportunities for more direct Integration of the physical world into computer-based systems, resulting in efficiently improvements ,economic benefits , and reduced human exertions.
A、internet of things
B、cloud computing
C、big data
D、mobile internet
答案解析與討論:www.jazzmuze.com/st/4099813317.html

70題: ()are those costs that cannot be directly traced to a specific project and therefore will be accumulated and allocated equitably over multiple projects by some approved and documented accounting procedure.
A、Direct costs
B、Operation costs
C、Indirect costs
D、Implement costs
答案解析與討論:www.jazzmuze.com/st/4100016928.html

71題: Earned value management(EVM) integrates the scope baseline with the ()baseline,along with schedule baseline,to form the performance baseline,which helps the project management team assess and measure project performance and progress.
A、qulity
B、risk
C、change
D、cost
答案解析與討論:www.jazzmuze.com/st/4100122755.html

72題: ()risks cannot be management proactively and therefore may be assigned a management reserve.
A、Knowm
B、Natural
C、Unknown
D、Human
答案解析與討論:www.jazzmuze.com/st/4100215332.html