信息系統(tǒng)項(xiàng)目管理師當(dāng)天每日一練試題地址:www.jazzmuze.com/exam/ExamDay.aspx?t1=1
往期信息系統(tǒng)項(xiàng)目管理師每日一練試題匯總:www.jazzmuze.com/class/27/e1_1.html
信息系統(tǒng)項(xiàng)目管理師每日一練試題(2025/6/19)在線測(cè)試:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
點(diǎn)擊查看:更多信息系統(tǒng)項(xiàng)目管理師習(xí)題與指導(dǎo)
信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2025/6/19)
試題1
項(xiàng)目評(píng)估的依據(jù)主要包括:項(xiàng)目建議書及其批準(zhǔn)文件、 ()報(bào)送組織的申請(qǐng)報(bào)告及主管部門的初審意見、項(xiàng)目關(guān)鍵建設(shè)條件和工程等的協(xié)議文件、必需的其他文件和資料等。查看答案
試題參考答案:D
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題2
下圖標(biāo)明了六個(gè)城市(A~F )之間的公路(每條公路旁標(biāo)注了其長度公里數(shù))。為將部分公路改造成高速公路,使各個(gè)城市之間均可通過高速公路通達(dá),至少要改造總計(jì)(1 )公里的公路,這種總公里數(shù)最少的改造方案共有(2 )個(gè)。
(1)A. 1000
B. 1300
C. 1600
D. 2000
(2)A. 1
B. 2
C. 3
D. 4
查看答案
試題參考答案:B、C
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題3
()提供治理過程與活動(dòng)來支持對(duì)項(xiàng)目組合及其組件的決策與導(dǎo)向。查看答案
試題參考答案:B
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題4
通常來說( )占用帶寬最大。查看答案
試題參考答案:D
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題5
配置審計(jì)包括物理審計(jì)和功能審計(jì),( )屬于功能審計(jì)的范疇。
A.代碼走查
B.變更過程的規(guī)范性審核
C.介質(zhì)齊備性檢查
D.配置項(xiàng)齊全性審核
查看答案
試題參考答案:A
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題6
關(guān)于干系人參與計(jì)劃的描述,不正確的是()查看答案
試題參考答案:C
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題7
關(guān)于項(xiàng)目風(fēng)險(xiǎn)管理的描述,不正確的是:()。查看答案
試題參考答案:A
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題8
Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to ( ) progress.
A. analyze
B. track
C. level
D. extend
查看答案
試題參考答案:B
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題9
()不屬于大型信息系統(tǒng)。查看答案
試題參考答案:A
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
試題10
項(xiàng)目經(jīng)理在()過程中,發(fā)現(xiàn)參加會(huì)議的主要領(lǐng)導(dǎo)無法出席,項(xiàng)目組原定的周一的項(xiàng)目例會(huì),改為周二召開。查看答案
試題參考答案:D
試題解析與討論:www.jazzmuze.com/exam/ExamDay.aspx?t1=1&day=2025/6/19
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |