軟件設(shè)計師每日一練試題內(nèi)容(2023/7/10)
試題1
著作權(quán)中,()的保護(hù)期不受限制查看答案
試題參考答案:C
試題2
以下關(guān)于面向?qū)ο笤O(shè)計的敘述中,錯誤的是( )
A、高層模塊不應(yīng)該依賴于底層模塊
B、抽象不應(yīng)該依賴于細(xì)節(jié)
C、細(xì)節(jié)可以依賴于抽象
D、高層模塊無法不依賴于底層模塊
查看答案
試題參考答案:D
試題3
ARP報文分為ARP Request和ARP Response,其中ARP Request采用(1)進(jìn)行傳送,ARP Response采用(2)進(jìn)行傳送。查看答案
試題參考答案:A、D
試題4
面向?qū)ο笤O(shè)計時包含的主要活動是( )。查看答案
試題參考答案:A
試題5
若程序運行時系統(tǒng)報告除數(shù)為0,這屬于 ( )錯誤。
A、語法
B、語用
C、語義
D、語境
查看答案
試題參考答案:C
試題6
在面向?qū)ο蟪绦蛟O(shè)計語言中,對象之間通過(1)方式進(jìn)行通信。以下關(guān)于好的面向?qū)ο蟪绦蛟O(shè)計語言的敘述中,不正確的是(2)。
(1)A.消息傳遞
B.繼承
C.引用
D.多態(tài)
(2)A.應(yīng)該支持被封裝的對象
B.應(yīng)該支持類寫實例的概念
C.應(yīng)該支持通過指針進(jìn)行引用
D.應(yīng)該支持繼承和多態(tài)
查看答案
試題參考答案:A、C
試題7
( )是對稀疏矩陣講行壓縮存儲的方式。查看答案
試題參考答案:B
試題8
一個具有767個結(jié)點的完全二叉樹,其葉子結(jié)點個數(shù)為( )。
A、383
B、384
C、385
D、386
查看答案
試題參考答案:B
試題9
Low-code and no code software development solutions have emerged as viable and convenient alternatives to the traditional development process.查看答案
試題參考答案:A、B、B、B、C
試題10
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (1)of the technical requirements for the software product.
During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each (2) that it must meet. The starting point is usually a set of high level requirements from the (3)that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and then defines (4) showing how the system will be operated publishes the system and operations concept document and conducts a system concept review (SCR).
Following the SCR, the team derives(5) requirements for the system from the high level requirements and the system and operations concept. using structured or object-oriented analysis. the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
(1)A、function
B、definition
C、specification
D、statement
(2)A、criterion
B、standard
C、model
D、system
(3)A、producer
B、customer
C、programmer
D、analyser
(4)A、rules
B、principles
C、scenarios
D、scenes
(5)A、detailed
B、outlined
C、total
D、complete
查看答案
試題參考答案:C、A、B、C、A
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |