PMP?每日一練試題(2022/8/10)

PMP?當(dāng)天每日一練試題地址:www.jazzmuze.com/exam/ExamDay.aspx?t1=33

往期PMP?每日一練試題匯總:www.jazzmuze.com/class/27/e33_1.html

PMP?每日一練試題(2022/8/10)在線測試:www.jazzmuze.com/exam/ExamDay.aspx?t1=33&day=2022/8/10

點擊查看:更多PMP?習(xí)題與指導(dǎo)

PMP?每日一練試題內(nèi)容(2022/8/10)

  • 試題1

    客戶對交付的產(chǎn)品不滿意,稱其并不符合他們的期望。項目經(jīng)理很驚訝,因為敏捷開發(fā)團隊提前幾個迭代交付了產(chǎn)品。項目經(jīng)理有什么方法可以避免這種結(jié)果?
    A: 要求團隊對需求的每一個持續(xù)的變更簽字
    B: 在做出變更之后,為產(chǎn)品測試留出更多資源
    C: 確??蛻粢庾R到演示的價值
    D: 確保團隊充分參與開發(fā)項目范圍
    A customer is not satisfied with the delivered product, saying that it was not what they expected. The project manager is surprised, because the agile development team delivered the product several iterations early. What is one way that the project manager could have avoided this result?
    A.Required team sign off for each of the constant changes to the requirements
    B.Set aside more resources for product testing after changes are made
    C.Made sure that the customer was aware of the value of demos
    D.Ensured that the team fully participated in developing the project scope

    查看答案

    試題參考答案:C

    試題解析與討論:www.jazzmuze.com/st/525558062.html

  • 試題2

    A project team is concerned that excessive overtime will be required to maintain the schedule currently, one produce component is taking twice as long to manufacture. The project manager should investigate the issue by performing which of the following?
    項目團隊擔(dān)心為保持進度計劃將需要過度加班。目前,一個產(chǎn)品部件需要花兩倍時間生產(chǎn)。項目經(jīng)理應(yīng)該通過執(zhí)行下列哪一項來調(diào)整這個問題?
    A、Root cause analysis 根本原因分析
    B、Force field analysis 力場分析
    C、Risk benefit analysis 風(fēng)險效益分析
    D、Cost-benefit analysis 成本效益分析

    查看答案

    試題參考答案:A

    試題解析與討論:www.jazzmuze.com/st/4948010703.html

  • 試題3

    在一個產(chǎn)品開發(fā)項目結(jié)束時,客戶滿意度調(diào)查結(jié)果顯示,客戶對于多個有價值的功能未包含進最終產(chǎn)品中感到失望,這些調(diào)查結(jié)果的可能原因是什么?
    A、工作分解結(jié)構(gòu)定義不良
    B、需求定義不良
    C、風(fēng)險登記冊未保持更新
    D、團隊在地理上是分散的

    查看答案

    試題參考答案:B

    試題解析與討論:www.jazzmuze.com/st/4819615662.html

  • 試題4

    項目經(jīng)理與供應(yīng)商同意產(chǎn)品規(guī)格不完整,應(yīng)添加功能,已更新項目管理計劃包含這些變更。項目經(jīng)理下一步應(yīng)該怎么做?
    A、提出合同變更請求
    B、更新項目文件
    C、更新變更日志
    D、修訂項目范圍

    查看答案

    試題參考答案:B

    試題解析與討論:www.jazzmuze.com/st/4633017782.html

  • 試題5

    When should be the right time to launch a formal acceptance of a project deliverables?
    什么時候應(yīng)該尋求項目可接受成果的正式驗收?
    A、Before the deliverables have been instated in the client systems 在交付成果安裝在客戶系統(tǒng)之前。
    B、after project deliverable have been instated in the client system. 在可交付成果安裝在客戶系統(tǒng)之后。
    C、after the project manager demonstrates that all client specifications have been completed 在項目經(jīng)理證明所有客戶需求均已滿足之后。
    D、after the project manager reports that all client specif cations have been completed 在項目經(jīng)理匯報所有客戶需求均已滿足之后。

    查看答案

    試題參考答案:C

    試題解析與討論:www.jazzmuze.com/st/4902320277.html

  • 試題6

    采購部門向項目經(jīng)理提供了—份能夠供應(yīng)一個項目可交付成果的供應(yīng)商名單,高級管理層堅持認為所有供應(yīng)商均有得合同的同等機會,然而,重要的是項目成本仍然起決定作用。項目經(jīng)理下一步應(yīng)該怎么做?
    A、與所有潛在供應(yīng)商召開一次投標人會議
    B、選擇之前曾以最低價格交付的供應(yīng)商
    C、從已證明是可靠的供應(yīng)商選擇最佳報價
    D、選擇將接受成本補償合同的供應(yīng)商

    查看答案

    試題參考答案:A

    試題解析與討論:www.jazzmuze.com/st/4617312757.html

  • 試題7

    A team member is working the required hours,but is delivering inadequate output. What should the project manager do first?
    一位團隊成員在要求的時間內(nèi)工作,但是交付的工作成果不足,項目經(jīng)理首先應(yīng)該怎么做?
    A、Notify the human resource department that the team member is under performing. 通知人力資源部門,該團隊成員表現(xiàn)不佳
    B、Meet with the team member to determine the reasons for low performance. 與該團隊成員會面,以確定低績效的原因
    C、Allocate some of the team member's work to other tea m members. 將該團隊成員的一些工作分配給其他隊成員
    D、Advise the team member of the consequences for not deliver the work. 告知該團隊成員不交付工作的后果

    查看答案

    試題參考答案:B

    試題解析與討論:www.jazzmuze.com/st/4800110104.html

  • 試題8

    在兩個產(chǎn)品的項目可交付成果中識別到臨缺陷,項目經(jīng)理必須提交一份報告識別并判斷文些缺陷。哪個基本質(zhì)量工具將幫助項目經(jīng)理完成這項工作?
    A、散點圖
    B、魚骨圖
    C、控制圖
    D、流程圖

    查看答案

    試題參考答案:B

    試題解析與討論:www.jazzmuze.com/st/4628511800.html

  • 試題9

    通過漸進的方式增加產(chǎn)品的功能,通過一系列重復(fù)的循環(huán)活動來開發(fā)產(chǎn)品,橫線處是:
    A、迭代增量 
    B、增量迭代 
    C、計劃適應(yīng) 
    D、適應(yīng)計劃

    查看答案

    試題參考答案:B

    試題解析與討論:www.jazzmuze.com/st/423252549.html

  • 試題10

    一家公司計劃推出一個新的數(shù)字銀行解決方案.在項目啟動時.識別到一個關(guān)鍵依賴關(guān)系,需要在產(chǎn)品推出前獲得監(jiān)管部門的批準,這被添加到風(fēng)險登記冊,并由項目經(jīng)理積極監(jiān)控。目前.仍未獲得監(jiān)管部門的批準,這可能會導(dǎo)致產(chǎn)品推出延期,項目經(jīng)理如何能夠減輕該風(fēng)險?
    A、準備風(fēng)險應(yīng)對措施
    B、在風(fēng)險登記冊中更新并跟蹤該風(fēng)險
    C、調(diào)整項目進度計劃包含應(yīng)急應(yīng)對措施
    D、評估被拒絕監(jiān)管批準的可能性

    查看答案

    試題參考答案:B

    試題解析與討論:www.jazzmuze.com/st/4646818997.html

信管網(wǎng)訂閱號

信管網(wǎng)視頻號

信管網(wǎng)抖音號

溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準!

信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。

信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。

相關(guān)內(nèi)容

發(fā)表評論  查看完整評論  

報考條件查詢

推薦文章

精選

課程

提問

評論

收藏