1、 [單選] 一個設(shè)計團隊被分配開發(fā)一項新技術(shù),讓公司能夠符合新的政府規(guī)定,應(yīng)該用什么來收集產(chǎn)品設(shè)計屬性?
A design team was assigned to develop a new technology. To allow the company to comply with new government regulations, what should be used to collect product design attributes?
A:控制圖
Control chart
B:需求跟蹤矩陣
Requirements traceability matrix
C:工作分解結(jié)構(gòu)(WBS)
Work breakdown structure (WBS)
D:親和圖
Affinity diagram
正確答案:B 你的答案:D
解析:審題:符合新的政府規(guī)定、產(chǎn)品設(shè)計屬性;定位:收集需求,本過程組輸出:需求跟蹤矩陣??刂茍D用于確定一個過程是否穩(wěn)定,或者是否具有可預(yù)測的績效。規(guī)格上限和下限是根據(jù)要求制定的,反映了可允許的最大值和最小值,用于監(jiān)測各種類型的輸出變量(詳見8.3.2.5) 親和圖用來對大量創(chuàng)意進行分組的技術(shù),以便進一步審查和分析,也是8.2管理質(zhì)量會用到的工具(8.2.2.4可以對潛在缺陷成因進行分類,展示最應(yīng)關(guān)注的領(lǐng)域)。創(chuàng)建WBS,輸出范圍基準
2、 [單選] 一個項目中途,發(fā)起人想要改變交付進度計劃,項目經(jīng)理下一步應(yīng)該怎么做?
In the middle of a project, the sponsor wants to change the delivery schedule. What should the project manager do next?
A:確定這對項目關(guān)鍵路徑的影響
Determine the impact of this on the critical path of the project
B:將其添加到問題日志中
Add it to the issue Log
C:提出一項變更請求
Make a change request
D:使用進度壓縮技術(shù)
Use schedule compression technology
正確答案:C 你的答案:A
解析:PMBOK(6)P113-4.6實施整體變更控制。審查所有變更請求、批準變更,管理對可交付成果、項目文件和項目管理計劃的變更,并對變更處理結(jié)果進行溝通。
3、 [單選] 一個組織正在開始一個大型的,首個這種類型的項目,項目經(jīng)理與相關(guān)方召開會議。以識別潛在的項目問題。項目經(jīng)理應(yīng)該使用什么工具和技術(shù)來改進會議的結(jié)果?
An organization is starting a large, first-of-its-kind type of project. The project manager holds meetings with stakeholders to identify potential project issues. What tools and techniques should the project manager use to improve the meeting results?
A:頭腦風暴,德爾菲技術(shù)和訪談
Brainstorming, Delphi technique and interview
B:頭腦風暴,因果圖和流程圖
Brainstorming, cause and effect diagram and flow chart
C:頭腦風暴,風險分類和專家判斷
Brainstorming, risk categorization and expert judgment
D:頭腦風暴,影響圖以及優(yōu)勢丶劣勢丶機會與威脅(SWOT)分析
Brainstorming, influence diagram and SWOT analysis
正確答案:A 你的答案:D
解析:考察識別風險的工具技術(shù),因果圖,風險分類,影響圖都是用于風險分析排除,選A
4、 [單選] 在執(zhí)行項目期間,發(fā)生了一個意外情況。項目經(jīng)理應(yīng)該審查哪些信息來確定適當?shù)男袆樱?br />
An unexpected situation occurred during the implementation of the project. What information should the project manager review to determine the appropriate action?
A:團隊社交門戶
Team social portal
B:項目管理計劃
Project management plan
C:經(jīng)驗教訓(xùn)
Lessons learned
D:專家判斷
Expert judgment
正確答案:B 你的答案:C
解析:應(yīng)查閱項目管理計劃的各種子計劃,以確定該意外情況對項目的成本,進度等方面的影響,并查看已規(guī)劃的應(yīng)對措施。
5、 [單選] 一份重要項目文件的過期版本被誤發(fā)給一組項目相關(guān)方。更新問題日志之后,項目經(jīng)理下一步應(yīng)該做什么?
An outdated version of an important project document was mistakenly sent to a group of stakeholders. After updating the issue log, what should the project manager do next?
A:確定糾正措施并執(zhí)行缺陷補救。
Determine corrective actions, and perform defect repair.
B:確定預(yù)防措施并執(zhí)行缺陷補救。
Determine preventive actions, and perform defect repair.
C:確定糾正措施并更新工作績效報告。
Determine corrective actions, and update the work performance report.
D:確定預(yù)防措施并更新工作績效報告。
Determine preventive actions, and update the work performance report.
正確答案:B 你的答案:A
解析:見PMBOK 8.3.1.3 為了處理版本誤發(fā)問題必須執(zhí)行缺陷補救,為了避免以后發(fā)生同樣問題需要確定預(yù)防措施。
6、 [單選] 一位關(guān)鍵相關(guān)方威脅起訴承包商,因為一個關(guān)鍵功能無法按預(yù)期執(zhí)行,承包商卻認為他們已經(jīng)按照約定履行了合同。在采購行動之前 ,項目經(jīng)理應(yīng)該查看哪份文件?
A key stakeholder threatened to sue the contractor because a key function could not be implemented as expected, but the contractor thought that they had performed the contract as agreed. Before the procurement action, which document should the project manager check?
A:質(zhì)量管理計劃
Quality management plan
B:需求跟蹤矩陣
Requirements traceability matrix
C:項目范圍說明書
Project scope statement
D:驗收標準
Acceptance criteria
正確答案:C 你的答案:B
解析:《PMBOK》第6版 154頁,5.3.3.1:范圍說明書。題干中描述的場景是甲乙雙方對是否履行了合同產(chǎn)生分歧,遇到這種問題時要看承包商是否滿足了驗收標準,所以要去查詢項目范圍說明書。雖然為解決分歧,需要去查閱驗收標準,但是題干中問的是哪份文件,所以不能選D。
7、 [單選] 一個施工項目位于熱帶地區(qū),該項目的風險登記冊包括雨季洪水的風險,現(xiàn)在雨季已經(jīng)結(jié)束,項目即將完成。應(yīng)使用哪一項工具或技術(shù)來管理這個風險?
A construction project is located in the tropics. The project's risk register includes the risk of flooding during the rainy season. Now that the rainy season is over, the project is about to be completed. Which tool or technology should be used to manage the risk?
A:風險審查會
B:風險轉(zhuǎn)移
C:風險規(guī)避
D:風險審計
正確答案:A 你的答案:D
解析:PMBOK》第6版 453頁,11.7:監(jiān)督風險,在控制風險中,經(jīng)常需要識別新風險,對現(xiàn)有風險進行再評估,以及刪去已過時的風險。應(yīng)該定期進行項目風險審查會。
8、 [單選] 在一個高層管理會議上,定義了戰(zhàn)略組織目標。其中一個目標是通過進入本地區(qū)內(nèi)的一個細分市場提高 8%的銷售組合。一名項目經(jīng)理被任命管理這個項目。項目經(jīng)理下一步應(yīng)該怎么做?
At a senior management meeting, strategic organizational goals are defined. One of the goals is to increase the 8% sales mix by entering a market segment in the local area. A project manager was appointed to manage the project. What should the project manager do next?
A:執(zhí)行成本效益分析。
Implementation cost-benefit analysis
B:召開焦點小組會議收集市場調(diào)研。
Hold focus group meeting to collect market research
C:執(zhí)行相關(guān)方分析。
Perform related party analysis
D:查閱組織過程資產(chǎn)。
Review organization process assets
正確答案:A 你的答案:B
解析:商業(yè)論證或類似文件能從商業(yè)角度提供必要的信息,決定項目是否值得投資。高于項目級別的經(jīng)理和高管們往往使用該文件作為決策的依據(jù)。在商業(yè)論證中,開展業(yè)務(wù)需要和成本效益分析,論證項目的合理性,并確定項目邊界。8%為戰(zhàn)略目標,商業(yè)論證中的成本效益分析論證戰(zhàn)略目標的可行性及可操作性,從而進行項目邊界定義。
9、 [單選] 項目經(jīng)理收到一個請求,向額外的項目相關(guān)方發(fā)送狀態(tài)報告。項目經(jīng)理應(yīng)該更新哪一份文件?
A project manager received a request to send the status report to the additional stakeholders. Which document should the project manager update?
A:項目章程
Project charter
B:變更日志
Change log
C:溝通管理計劃
Communication management plan
D:相關(guān)方參與計劃
Stakeholder management plan
正確答案:C 你的答案:B
解析:《PMBOK》第6版 377頁,10.1.3.1:溝通管理計劃,溝通管理計劃中包括相關(guān)方的溝通需求,需溝通的信息,接收信息的人員或群體等信息。
10、 [單選] 由于客戶對解決方案的期望得到滿足,一個項目被終止,項目經(jīng)理現(xiàn)在應(yīng)更新哪一份文件?
Since the customer's expectations for the solution were met, a project was terminated. Which document should the project manager update now?
A:項目記錄
Project records
B:經(jīng)驗教訓(xùn)
Lessons learned
C:相關(guān)方通知
Notice of stakeholders
D:項目演示
Project demonstration
正確答案:B 你的答案:A
解析:《PMBOK》第6版 39頁,2.3:組織過程資產(chǎn),組織過程資產(chǎn)中包括以往項目的經(jīng)驗教訓(xùn)和歷史。項目雖然被終止,但是要對項目實施過程中暴露出來的問題進行分析總結(jié),匯總?cè)虢M織過程資產(chǎn)。
11、 [單選] 在項目實施期間,一些團隊成員抱怨說他們對項目可交付成果不確定。若要確保項目團隊按照項目范圍工作,項目經(jīng)理應(yīng)該怎么做?
During project implementation, some team members complain that they are unsure about the project’s deliverables. What should the project manager do to ensure that the project team is working according to project scope?
A:審查執(zhí)行、負責、咨詢和知情(RACI)矩陣。
Review the responsible, accountable, consult, and inform (RACI) matrix.
B:更新溝通管理計劃,澄清期望。
Update the communications management plan to clarify
C:與團隊分享項目章程。
Share the project charter with the team.
D:將工作分解結(jié)構(gòu)(WBS)分發(fā)給團隊。
Distribute the work breakdown structure (WBS) to the team.
正確答案:D 你的答案:A
解析:WBS 是對項目團隊為實現(xiàn)項目目標、創(chuàng)建所需可交付成果而需要實施的全部工作范圍的層級分解。
————————————————
版權(quán)聲明:本文為CSDN博主「LK_Tracking」的原創(chuàng)文章,遵循CC 4.0 BY-SA版權(quán)協(xié)議,轉(zhuǎn)載請附上原文出處鏈接及本聲明。
原文鏈接:https://blog.csdn.net/weixin_40039983/article/details/108405385
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習,滿足不同學(xué)員考證需求,降低課程學(xué)習難度,使學(xué)習效果事半功倍。
相關(guān)內(nèi)容